Parody letterhead: DELIVERING FOR QUEENSLAND, a four-legged rooster and centaur coat of arms, FEDERAL Government FISHERIES (satire, not a real government logo)

A four-legged rooster and a centaur. Parody satire.

Bubble-Nest Planning Regulations 1994

Statutory Rules No. 112 of 1994, made under the Fighting-Fish (Bowl Sovereignty) Act 1987

Status: In force. Compilation No. 9. Part 4 is under review because nobody can find Part 3.

Regulations to govern the planning, approval, construction, occupancy, inspection and spontaneous collapse of bubble nests within the Realm.

Fictional legislation. 14 sections. Not law anywhere, including in the bowl.

Contents
  1. Part 1 — Preliminary
  2. Part 2 — Development approval
  3. Part 3 — [Missing]
  4. Part 4 — Construction standards
  5. Part 5 — Objections and heritage
  6. Schedule 1 — Prescribed corners
  7. Amendment history

Part 1 — Preliminary

1 Name of Regulations

These Regulations are the Bubble-Nest Planning Regulations 1994.

2 Authority

These Regulations are made under section 15 of the Fighting-Fish (Bowl Sovereignty) Act 1987 and are laminated in accordance with that section.

3 Definitions

In these Regulations:

bubble nest means a floating structure of bubbles assembled by a fish with apparent intention, including a structure that is assembled with no apparent intention but looks quite nice.

development means the commencement, enlargement, renovation or abandonment of a bubble nest.

heritage nest means a bubble nest that has lasted longer than one hour.

Part 2 — Development approval

4 Development approval required

(1) A fish must not commence a development unless a development approval is in force.

(2) Subregulation (1) is satisfied if the fish has thought about it first.

(3) A fish that has not thought about it first is taken to have thought about it first.

5 Application for development approval

An application for development approval must be made on Form B-02 (Notice of Intention to Make Bubbles) and must be accompanied by:

(a) a site plan, showing the corner;

(b) an elevation, showing the surface; and

(c) a statement of environmental effects, which may consist of the single word "bubbles".

6 Matters to be considered

In determining an application, the Registrar must consider:

(a) whether the proposed nest is in keeping with the character of the Realm;

(b) the likely impact of the nest on the plastic plant, which has expressed no view; and

(c) any objection lodged by a snail, which must be disregarded under regulation 11.

7 Deemed approval

If the Registrar does not determine an application within 30 minutes, the application is deemed approved, which is fortunate, because the nest will already have been built.

Part 3 — [Missing]

Note: Part 3 is believed to have dealt with setbacks from the filter outlet. It was last seen in 1996 in a manila folder marked "Misc. (Wet)". Anyone with information should complete Form FF-999.

Part 4 — Construction standards

8 Bubble sizes

(1) Bubbles in a nest must be bubble-sized.

(2) A bubble larger than bubble-sized is a balloon and is regulated under a different scheme that the Registry does not administer.

9 Height limit

A bubble nest must not exceed three bubbles in height above the waterline, unless the fish can demonstrate exceptional architectural merit by means of a sustained flare.

10 Filter setback

A nest must not be built within one fin-length of the filter outlet, because it will not work, and everyone will be upset.

Part 5 — Objections and heritage

11 Snail objections

(1) A snail may lodge an objection to a development.

(2) An objection under subregulation (1) must be disregarded.

(3) The Registrar must nonetheless thank the snail for its contribution.

12 Heritage listing

(1) A heritage nest may be entered on the Register of Significant Nests.

(2) A heritage nest that collapses is removed from the Register and entered on the Register of Formerly Significant Nests, which is longer.

13 Demolition

A fish may demolish its own nest at any time, without notice, for any reason or none, and this is considered a normal part of the planning cycle.

14 Water changes

A human performing a water change must take reasonable care not to disturb a heritage nest, and if disturbance is unavoidable, must say "sorry" aloud.

Schedule 1 — Prescribed corners

For regulation 5(a), a corner includes a corner, a curve the fish has decided is a corner, and the area behind the heater.

Amendment history

← Back to all legislation

Last updated: 19 October 2026. This page has been reviewed by the Committee for Reviewing Pages, which determined that it is a page.